


Recharge Well
Creation of a well around the Bore well casing pipe (Depth 5.04 MTRs, 1.37 MTR in diameter) Fixing of the specially designed `V’ wire Non-Clogging strainer to the casing Pipe to allow the water into the sub soil to Re-charge the groundwater.
Reinforced concrete cement rings are used to construct recharging well to hold the Filtered water since any ground will not be able to percolate all the received rainwater at a stretch. Hence the storage of water is indispensable for the slow percolation.